【关键词】工程材料;监理规划;进场后监管;砼质量控制

site supervision of construction materials control practices

zhang mei

(xinjiang petroleum engineering construction supervision co., ltd karamay xinjiang 834000)

【abstract】engineering materials varieties. varying quality, quality will directly affect the safety of buildings durability. use of poor quality materials, quality problems caused by the presence of industrial and civil engineering through quality management and supervision practice, supervision engineers introduce quality control in engineering materials specific practices.

【key words】engineering materials;supervision plan;after entering supervision;concrete quality control

建筑工程使用的材料品种多质量各异,但质量的优劣直接影响到建筑物的安全耐久性能。因使用材料质量低劣而引起的返工处理和纠纷,导致质量问题的存在现象在许多工程时有发生,因此,如何控制好建设用材料质量,是施工技术人员及监理工程师现场控制的重点工作。在施工现场建筑材料的监控中最常见的问题是,材料送检样品与实际使用的材料存在差异;一些材料未通过检验巳用于施工;采购材料时提供的合格证,检验资料与进场材料不相符合;材料不能按使用进度供货而影响需用等。对工程用材料质量的监控,是工程技术人员尤其是监理工作的重中之重,绝不能迁就凑合。通过对工业建筑及民用工程的施工质量管理的监理实践,浅要分析介绍监理工程师在进行工程材料质量控制时的具体做法,提供参考依据。

1. 审查施工企业管理制度的制定

在建设项目开工之前,要详细审查施工企业申报监理的工程组织设计及材料采供计划,要求施工单位配备专业技术人员负责材料的采购与供应,使用过程中工程技术人员严格把关。例材料采供中的具体采购细则,取样送检规定及频率,执行的标准等。在材料供应计划中重点考虑开工前主要材料的储备,抽查复检的时间必须在使用前做完。施工中根据工程进度确定的时间不要影响使用。同时将材料供应计划上报给业主,前期的材料准备是为工程开工起有力的保证作用。

2. 监理规划及细则制定

2.1 要提前熟悉施工图纸中建筑结构的特殊要求和施工组织设计的内容要求,工程监理规范的监督规定,由总监理工程师主持编制工程监理规划。工程项目监理部在特殊过程或关键工序(工艺)开工前,由各专业监理工程师负责编写相应的监理细则,由总监理工程师签发执行。在监理规划中明显监理人员的职责、工作程序、方法步骤、手段、对材料的质量要求和质量保证应采取的措施等。现场材料专业监理工程师的监理程序是:

(1)施工单位向监理工程师提供材料供应计划。

(2)监理工程师对现场材料的生产厂家进行资质审查;对进场材料的合格证及试验资料进行检查,检查内容包括材料的数量、规格、型号及外观质量是否符合计划的质量要求。

(3)认真填写工程材料、构配件、设备报验单a-9工程的原材料、构配件、设备等半成品及成品进场时,项目监理部门的监理工程师应督促工程承建商按规定填写“工程材料、构配件、设备报审表”(a-9)报审,并依据有关规范、设计图纸、样板及《建筑工程施工质量验收统一标准》(gb50300-2001),审查报验建筑材料、建筑构配件、设备的名称、规格、数量、合格证、准用证、实验报告、使用部位等(进口的材料或设备还应按合同要求审查《原产地证明书》和《质量保证书》及《商检报告》),是不符合设计、合同及有关规定。合格后,才能在“工程材料、构配件、设备报审表”(a-9)上批准同意工程承建商将材料、构配件、设备用于工程中。如发现不合格的材料、构配件、设备,应立即下达推场通知并监督实行,坚决杜绝不合格的建筑材料、建筑构配件、设备在工程上使用。监理人员对原材料进行抽查,并必须由持有见证送检卡的监理人员进行见证取样并送检。如果项目监理

部对提供的检验结果有疑问时,应另行抽样,送质量监督站指定的检验单位检测。而监理部对施工过程送检工作及重要的试验结果,在监理日志里作详细记录。

(4)检查送检报告,送检报告要达到施工规范要求后的固定格式才准使用,达不到标准合格要求的材料,除不淮使用外应立即清除出现场。认真填写好不合格材料的清场记录,对材料品种数量及时间记录汇报清楚。

(5)做好抽查记录,施工企业技术人员的施工日志,必须对清场材料有记录,同时要抽查与施工现实相符合,达到每批材料使用在建筑的那个准确位置。

2.2 工程总监在项目开工前参加由建设单位主持召开的笫一次工程会议,向工程承包商进行监理工作交底,介绍监理计划的内容,对施工准备情况提出意见和要求,并回答承包单位提出的工程方面诸多问题。达到施工方允分了解监理要求及工作程序,经过会议互相沟通为保证监理工作的开展和顺利进行打开良好的开端。  3. 材料进场后的监管

材料进场要按照工程进度来控制。在每批材料进场前监理人员会同现场施工技术人员对材料生产厂家资质及质量保证措施进行核检,并要求生产厂提供进场产品的质量保证书,根据质量保证书提供的项目对产品再次检验,对外观或其它不符合要求的不得用于工程。认真按要求对进场材料按比例进行抽样送检,监理自己首先查看各种进入现场各种材料的合格证和检验报告,再按试验取样要求抽取样品送检。抽样的部位,数量,批次,方法要满足要求,以下就常用的几种材料质量控制措施进行浅介。

3.1 水泥质量。

水泥在工程施工中最重要也是最大宗的建筑材料。水泥在进场时必须附有出厂合格证和检验报告,并对水泥产品及品种,包装,强度,批次及出厂时间核实验收。按规定水泥出厂三个月要重新复检,按化检结果重新进行配合比使用。应该一个工程尽量采购一个厂家的同品种水泥,以确保质量和减少试验次数。安定性是水泥的重要指标,若安定不合格时必须退回产品;但水泥的强度等达到要求,富余量不高也可以使用,只是配合比考虑其实际强度设计即可。

3.2 钢筋质量。

(1)所有进场的钢筋都必须有出厂合格证,检测报告,每捆或盘应有标志牌。进厂钢筋按批次,炉号及规格分批堆放及检验,检验内容包括标志牌,外观察检,并按现行规范要求抽取试样送有资质的试验室进行全检,检验结果出据报告再用于结构施工。

(2)钢筋在制作加工过程中若出现脆裂,焊接性能差,或力学性能有异常情况,要按照现行材料检验标准对该批次钢筋重新取样进行力学化学分析或分专项检验。

(3)对钢筋的外观也必须进行,外观检查的内容包括:实际直径标志牌,外形,长度,端头,弯曲,锈蚀状况。如果经过对每种筋仔细的外观查看,就可以分辩出是否非标生产的钢筋。对外观检查不合格的产品,应按照相关规定,监督施工单位清退出现场,并汇报主管部门防止流入其它建筑工程使用。

3.3 土产材料和外加剂。

对进入现场的砂石料按照现行的“普通砼用碎石和卵石质量标准和方法”jgj53中的具体规定和“普通砼用砂质量标准及检验方法”jgj52的具体规定见证取样送试验室检验。对工程用于砼的外力加剂要执行“砼外加剂应用技术规范”gb50119和现行的“砼外加剂”gb8076中的相应要求。目前可用在砼中的外加剂品种繁多,另外还有防水剂,泵送剂,膨胀剂等。作为工程现场监理人员,必须熟悉以上及相应规范标准的详细要求,并了解外加剂的基本性能和掺用要求,才能有效的控制施工用原材料的质量,确保工程质量。

3.4 钢筋焊接控制。

目前工程用钢筋连接的方式很多,焊接钢筋是传统的最老的一种连接方法,但是仍然在采用。对焊接钢筋的人员资质有严格的要求,必须持有合格的上岗证,操作规范。对焊接接头受力部位要分别抽取样品送试验,当各项力学性能满足设计要求才能够继续焊接。对焊接成型的钢筋质量检查是监理工程师的重要工作。除按要求送试验室检验卟,还要逐一对接头目观检查。对搭接长度,焊缝宽度,咬肉,凹陷,夹渣及焊缝高度进行全面检查,当发现其中某个环节不符合时,坚决整改直至达到要求。

3.5 砼工程。

砼的质量性能除了受制于各组成原材料的质量影响外,在很大的程度上取决于现场施工的质量控制。在形成结构体的整个工艺过程中,不同工艺对施工质

量的影响是不一样。有的环节影响重大,有的环节只是一般影响。由于在全世界目前仍将砼的抗压强度作为主要检验标准,因此施工环节的质量控制优劣是直接影响结构的安全耐久性能。施工过程中影响砼质量的因素很多,如原材料计量,配合比例,水灰比,搅拌,运输,入模振捣,养护等。在砼施工质量控制中应特别重视的是:

(1)检查各组成材料的试验合格证及报告,在完全符合后再施工。

(2)对粗骨的连续级配差和细骨料在试验室试验的基础上现场再调整。

(3)严格按配合比称量配置原材料,计量准确误差在允许范围内,不允许加大水灰比和水泥用量,这样会加大砼结构的开裂,提高强度其后果是影响结构的耐久性。

(4)掺用外加剂和掺合料必须匹配准确,适应性好,用量合理。

(5)砼混合料的搅拌时间一般不少于90s.当掺入外加剂后的搅拌时间不少于120s以保证拌和的均匀。

(6)运输砼拌和料时间不能长,也不允许漏浆。

(7)振捣十分关键,漏振和过振都会造成不良后果。

(8)养护同样重要,尤其是早期或膨胀砼,更不能失水和养护时间不够。

3.6 水.暖.卫及电气安装。

建筑工程中除主体结构及围护,门窗的大宗工程外,使用中必须具备的建筑安装工程及材料也是很多,如上,下各种管道材料,暖气材料,卫生洁具,空调通风,消防,电气,火灾报警器材,以及所配套的各种材料,品种繁多质量各异。监理工程师必须对所有材料及器具认真对照检查验收。由于这些产品对整个建筑的安装工程有较大影响,对安全使用和外观感更是要高度重视的。不合格或低劣的器具产品在安全使用和耐久性均受很大影响,而材料的监督控制又容易出现重视主体而忽视安装的表现。在建筑安装质量控制中重点抓器具及材料的质量验收检查,重点检查的器材内容是:

(1)给水排水,消防,暖气,卫生管道,电线管,预埋套管,阀门,开关等质量。

(2)电缆,电线,配电盘,照明灯具,开关,面板,插座的质量等。

(3)卫生洁具,洗面洗手盆,大便器,消防栓,消防带,箱,喷头,连接配件,地漏等。

这部分安装及器具必须具有产品合格证件,如检测报告,抽样试验检验报告及使用说明书等。监理人员只有认真按监理规定和程序进行逐一详尽的控制工作,才是符合监理职责要求的。实践表明,工程施工必须控制进场原材料的质量合格,才是确保施工质量达到设计要求,使建筑物的质量符合安全耐久性的目标。

参考文献

[1] 普通砼用砂质量标准及检验方法jgj52.

[2] 砼外加剂应用技术规范gb50119.

电线检验报告和检测报告范文第2篇

电线供货合同范文1甲 方(需方):

乙 方(供方):

经三方协商同意,根据我国《合同法》订立合同如下:

第1条:质量标准及价额

根据工程需要,该工程所用电线电缆经三方同意由乙方供货,其产品名称、规格、质量(技术指标)、单价等如下表

第2条:供货退货规定

1、质量规定:三方约定由乙方负责采购所需的电线电缆材料,应为符合设计要求的合格产品,交货时必须有生产厂家的合格证和有关质检部门的检验报告,经建设单位(业主)、监理单位及甲方验收合格才能使用。

2、交货方式:根据甲方提供的所需数量及时送货到施工现场(由甲方指定库房,乙方负责下货搬运),由甲方保管员当面点清货物规格数量,在乙方“送货单”上签字方可作为乙方在甲方供货的入库依据。

3、交货地点:彭水县两江桥旁乌江画廊游客接待中心改办公楼工程。

4、交货日期:本合同签订之日起 四 日内必须供货到交货地点。

5、退货规定:由于乙方所供货物发现质量问题,乙方必须退货,甲方未使用完的电线电缆乙方同意退货结算。

第3条:货款结算办法

三方约定乙方货款由彭水县江汇国有资产经营管理公司经甲方认可代付给乙方,乙方供货到甲方施工现场经业主、监理、甲方等验收合格后首付货款80%,其余货款于工程完工明确工程实际用量后一次性付清。

第4条:争议和纠纷处理

4.1本合同未尽事宜,双方协商解决。

4.2本合同在履行期间,双方发生争议时,在不影响工期的前提下,双方可采取协商调解或请有关部门解释。当事人不愿通过协商、调查解决或者协商、调解不成时,可向人民法院起诉。

4.3本合同一式两份,经三方签字盖章后生效。每份均具同等法律效力,竣工验收结清工程材料款后自动失效。

甲方(公章):_________乙方(公章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

电线供货合同范文2出卖人(以下简称“甲方”):

买受人(以下简称“乙方”):

第一条 标的、数量、价款及交(提)货时间:

第二条 质量标准:按照国家规范、技术标准的要求进行生产,严格执行经八路高层住宅电线电缆招标文件JAJB-1201的规定。

第三条 出卖人对质量负责的条件及期限:在规定的期限内对所供应的产品质量负责。 第四条 包装标准、包装物的供应与回收:电缆盘需回收

第五条 随机的必备品、配件、工具数量及供应办法:合格证、检测报告 第六条 合理损耗标准及计算方法: 无

第七条 标的物所有权自交付之日起转移。标的物所有权转移前的全部风险由甲方承担。

第八条 交(提)货时间、方式、地点:交货地点为济南市经八路高层住宅工地西楼。交货时间:以乙方书面通知时间为准。交货方式:双方按合同及国家质量标准进行验收。

第九条 运输方式及到达站(港)和费用负担:汽车运输到经八路高层2号院西段工地,甲方承担运输途中一切费用和卸车费用,在运输及材料装、卸过程中发生的一切事宜均由甲方承担。

第十条 检验标准、方法、地点及期限:货到工地后由乙方工地负责人和工程监理根据施工要求进行验收,如符合要求,买受人或其委托人应在7天内签字确认并出具收货及验收凭证,如发现到货与合同规定的品种、规格、材质、数量、质量不符,应在24小时内提出异议,如发现破损现象,甲方应无条件更换。

第十一条 成套设备的安装与调试:无

第十二条 结算方式、时间及地点:按实供数量结算,合同签订后预付20%的货款,货到工地并验收合格15日内付至总货款的50%;安装完毕验收后付至总货款的95%,余款5%为质量保证金,交房验收合格后2年无质量问题付清所有货款,以正式发票结算。

第十三条 担保方式(也可另立担保合同): 无

第十四条 本合同解除的条件:双方货款结清后,10日内合同自动失效。

第十五条 违约责任:

1.工业品品种、规格、质量不符本合同规定时,甲方应负责产品的调换。由于上述原因致延误交货时间,每逾期一日,甲方应按逾期交货部分货款总值 2‰ 计算向乙方偿付逾期交货的违约金并承担不能按时交货而给乙方造成的经济损失。乙方有权解除合同。

2.甲方未按本合同规定的产品数量交货时,少交的部分,乙方如果需要,应照数补交。如乙方需要而甲方不能交货,则甲方应付给乙方不能交货部分货款总值的 2‰ 的违约金。乙方工程结束若有部分剩余产品,按本合同价退货,退货运费由乙方承担。

3.产品交货时间不符合合同规定时,每延期一天,甲方应偿付乙方以延期交货部分货款2‰ 的违约金。

4. 产品价格如须调整,必须经双方协商,在双方未达成协议前或双方不能达成新的协议,仍应按合同原订价格执行。如甲方因价格问题而影响交货,则每延期交货一天,甲方应按延期交货价款的 2‰ 作为违约金付给乙方。

5. 甲、乙任何一方如要求全部或部分解除合同,必须提出充分理由,经双方协商一致后方能施行,提出解除合同的一方须向对方偿付因解除合同带来的经济损失。

6. 本合同所订一切条款,甲、乙任何一方不得擅自变更或修改。如一方单独变更、修改本合同,对方有权拒绝收货或供货,并要求单独变更、修改合同一方赔偿一切损失。

7. 甲、乙任何一方如确因不可抗力的原因,不能履行本合同时,应及时向对方通知不能履行、延期履行或部分履行合同的理由。在取得对方同意后,本合同可以不履行或延期履行或部分履行,并免予承担违约责任。

8.本合同在执行期间,如有未尽事宜,得由甲、乙双方协商,另订补充协议,补充协议与本合同具有同等法律效力。本合同及其附件和补充协议中未规定的事项,均遵照中华人民共和国有关法律、法规执行。

第十六条 合同中约定的双方权利与义务不得转让。如一方转让,另一方有权解除本合同或要求对方承担因此而给其造成的损失。

第十七条 合同争议的解决方式:本合同在履行过程中发生的争议,由双方当事人协商解决;协商或调解不成的,双方约定依法向 济南 铁路运输法院起诉。

第十八条 本合同一式陆份,乙方肆份,甲方贰份,自签订之日起生效。

第十九条 其他约定事项:

(1)甲方在履行合同期间,应执行国家及行业有关安全质量的法律法规,如甲方在履行合同期间发生安全质量问题,甲方应负全部责任,并负责赔偿。

(2)甲方在履行合同期间,应执行国家及行业有关环境及职业健康方面的法律法规,如甲方在履行合同期间出现环境污染问题及职业健康问题,甲方应负全部责任并负责赔偿。

甲方(公章):_________乙方(公章):_________

法定代表人(签字):_________ 法定代表人(签字):_________

_________年____月____日 _________年____月____日

电线供货合同范文3甲方:

乙方:

依照《中华人民共和国合同法》及相关的法律法规,遵循平等、自愿、公平和诚实守信的原则,甲、乙双方本着互惠互利的宗旨,经双方协商,达成如下协议:

一、乙方电缆电线必须达到国家指定标准,并有检验报告、出厂合格证,费用由乙方负责。供货运到甲方指定的地点,规格及数量:详见附表,运输途中一切费用和一切问题由乙方负责,与甲方无关。

二、材料进入甲方工地,事前一定要得到甲方的认可;进入工地的材料,一定要达到甲方要求和数量。违者,一切责任由乙方负责。

三、供货数量总价:以附表为准,并按实际到场签证为依据。

四、供货时间:20xx年4月4日开始至20xx年4月8日供完。

五、乙方必须保证按时、按质(按样板)、按量供应充足材料给甲方使用,违者,一切责任由乙方负责。

六、结算方式:货到齐后开一个月期票结清。

七、本合同甲、乙双方本着友好合作的宗旨,未尽事宜,双方协商解决;若发生诉讼事宜,可向中山市人民法院诉讼解决。

八、本合同一式贰份,甲、乙双方各执一份,自签字之日起生效。

甲方(公章):_________乙方(公章):_________

电线检验报告和检测报告范文第3篇

消防电安装节能施工方案

期:

哈尔滨奥特消防机电安装有限公司

消防电节能施工组织设计方案

一:项目概况

本工程为松北区****车库,本工程设有消防动力系统,消防报警系统,消防联动系统。

二:施工过程技术组织措施、管理措施

为了确保本项目满足设计要求和有关节能规范要求,除严格按照设计图纸施工外,重点采取如下施工组织措施对施工过程进行控制:

1、充分了解设计意图

施工前请设计人员进行设计技术交底,

充分明白设计意图

2、选用材料严格把关

选用的材料必须满足设计和规范要求

3、施工前的技术交底

4、施工过程中的工艺控制

具体见下面各分部施工工艺

5、施工过程中的质量控制严格按设计和规范要求控制施工的各过程

6、隐蔽工程验收制度

7、成品保护制度

三、编制依据

1.《电缆线路施工及验收规范》(GB50168-92)

2.《建筑安装工人安全技术操作规程》

3.《电气装置安装工程施工及验收规范》(GB50245-50259-96)

4.《建筑安装工程资料管理规程》DBJ01—51—2000。

5.《安装工程施工及验收规范》。

6、其他相关施工标准规范、产品行业标准

四、编制目的

确保国家现行节能质量验收规范、标准及设计图纸得到严格落实,同时为节能施工提供技术保障。

五、消防电工程施工准备

1.

设计图纸已经节能机构审查合格;

2.

配电节能工程采用的材料、设备等产品进场时,按照设计、规范、标准要求对其类型、材质、规格、有关技术性能参数及外观等进行检查验收,并形成验收记录。

3.

主要设备、材料、成品与半成品出厂合格证和检验报告根据设计和相关标准规定进行核查,并分类整理,逐一编号,并做好合格证汇总表。

4.

低压配电系统选择的电缆、电线应进行复验,复验见证取样送检,经有资质的实验室复试合格后,方可使用;。

5.

配电工程安装完成后按照规范规定进行低压配电系统的调试,调试结束后采用相应的仪器仪表对电源质量性指标进行检测,并填写好检测结果。

6.

母线与母线与电器接线端子,当采用螺栓搭接连接时,使用力矩扳手对压接螺栓进行力矩检测,检测值符合《建筑电气工程施工质量验收规范》GB

50303标准后才可通电运行。

六、分部施工工艺

(一)电缆敷设

①、电缆敷设前应做好以下工作:对电缆进行外观检查及绝缘电阻试验。1

KV以下电缆用摇表测试,不低于l

Ω。所有试验均应做好记录。

②、电缆型号、规格及长度与设计资料核对无误。电缆不得有扭绞、损伤。

③、电缆线路两端连接的电气设备或连接箱、盒应安装完毕或已就位,

敷设电缆的通道应无阻塞;

④、在室外电缆沟敷设电缆,在敷设前对电缆沟应迸行清理,并且根据设计规定的地平标高进行深度测量,以免因填土后造成电缆埋

设过深或过浅现象;

⑤、电缆敷设前,还应进行下列项目的复查:;

支架应齐全,油漆完整;

电缆型号、规格、电压应符合设计要求;

电缆绝缘良好。

⑥电缆敷设应注意的问题:

电力电缆与控制电缆应分开排列;

当电力电缆与控制电缆在同一侧支架上时,应将控制电缆放在电力电缆下面,l

KV以下电力电缆放在l

KV以上电力电缆的下面。

并列敷设的电力电缆,其相互间的净距应符合设计要求;

电缆与热力管道、热力设备之间的净距:平行时应不小于l

M;交叉时应不小于0.5M。如无法达到规定距离时,应采取隔热保护措施。电缆不宜平行敷设热力管道的上部;

隐蔽工程应在施工过程中进行中间验收,并作好签证;

在验收时,应进行下列检查:电缆规格应符合规定,排列整齐,无机械损伤,标志牌应装设齐全、正确、清晰;电缆的固定、弯径、有关距离及单芯电力电缆的金属护层的接线等应符合要求;电缆终端头、电缆接头、电缆支架等的金属部件,应油漆完好,相色

⑦电缆敷设质量应达到的优良标准:

电缆支架托架安装:在合格基础上,间距均匀,排列整齐,横平竖直,油漆色泽均匀;

电缆保护管安装:在合格基础上,弯曲处无明显折皱和不平;出入地沟、隧道和建筑物,保证管坡度及坡向正确。明敷部分横平竖直,成排敷设的排列整齐;

电缆敷设:在合格基确上,电缆在转弯和分支处不紊乱,走向

整齐清楚,电缆的标志桩、标志牌洁晰齐全,直埋电缆的隐蔽工程记录及简图齐全、准确:

电缆及其支、托架和保护管:在合格基础上,线路走向合理,色标准确,涂刷后不污染设备和建筑物。

(二)电气配管

①、钢管内、外均应刷防腐漆

(埋入混凝土内的管外壁除外),埋入土层内的钢管,应刷两度沥青或使用镀锌钢管;使朋镀锌钢管时,在锌层剥落处,也应刷防腐漆。钢管内壁除锈可采用人工清除,用圆形钢丝刷来回拉动、用压缩空气吹除、高压水清洗、不良处切断清除(切除一般管子后清除)等方法。管子外壁采取钢丝刷打磨,也可用电动涂锈机涂锈。

②、切断钢管,可用钢锯或用管子切割机切断。钢管不应有折扁和裂缝,管内无铁屑及毛刺,切断口应挫平,管口应刮光。

③、套丝,管端套丝长度不应小于管接头的1/2,在管接头两面三端应焊跨接地线。

④、弯管,钢管明配需随建筑物结构开头进行立体布置,但要尽量减少弯头。弯管常采用弯管器、滑轮弯锚器、气焊加热等方法。

⑤、连接,钢管之间的连接,暗配管一般采用套管连接。套管长度为连接管外径的1.5—3倍,连接管的对口处应在套管的中心,焊口应焊接牢固、严密。钢管另一种连接方法,端套丝长度不应小于接头长度的1/2,在管接头两端应焊接接接地线。薄壁钢管的连接必须用

丝扣连接。钢管与接线盒、开关盘的连接,可采用螺母连接或焊接。采用螺母连接时,先在管子上旋一个锁紧螺母,然后将盒上的敲落孔打掉,将管子穿入孔内,再用手旋上:螺母,最后用扳手把盒外锁紧螺母旋紧。

⑥、配管敷设步骤:

确定电气设备的位置

划出管路中心线管管路交叉位置

量取管线长度

把钢管按建筑形状弯曲

根据测量得管线长度锯切钢管

铰制管端螺纹

将管子、接线盒、开关盒装配连接成一整体后进行安装

⑦、暗配管敷设步骤:

确定各接线盒的位置

测量敷设线路长度

钢管加工(弯曲、切割、套螺丝)

将管与盒按已确定的位置连接起来

管口塞上木屑或废纸,盒内填满废纸或木屑,防止进入水泥砂浆及颗粒物

检查管、盒装设位置是否全部正确

管、盒连接整体后固定于横板上

(最好在未绑扎钢肪时迸行)

管与简和管与箱违接处,焊接接地线,使金属外壳违成一体

(三)钢管穿线

①、钢管穿引线铁丝。穿线工作一般是在上建粉刷工程结速后进行。引线采用φ1.2—1.6的铁丝,铁丝头部弯成圆圈,以防止在管内遇到管接头时被卡住。如管路较长或弯曲较多时,可在敷设钢管时将引线铁丝穿好,以免穿引困难。

②、穿线。对整盘绝缘导线,必须从内圈抽出线头进行放线。引线铁丝穿通后,引线一端应写所穿导线纬牢。穿线前,钢管口应先装上螺母,以免穿线时损伤导线绝缘层。穿线时,需两人各在管口一端,一人慢慢抽拉引线铁丝,另一人将导线慢慢送入管内。如钢管较长,

弯曲较多,穿线困难时,可用滑石粉。

③、剪断导线。导线穿好后,剪除多余的导线,但要留出适当余量,便于以后接线。预留长度:接线盒内以绕盒一周为宜,开关板内绕板内半周为宜。

④、垂直钢管内导线的支撑,为减少管内导线自重所产生的下垂力,保证导线不因自重而折断,导线应在接线盒内固定。接线盒距离按导线截面不同而不同,应按规定执行。

⑤、对钢管穿线的其它要求:

线路不得在锅炉、烟道和其它发热表面上敷设

敷设于多尘和潮湿场所的电线管路,管口、管子连接处均作密封处理

敷设的导线应便于检查、更换

不同的回路、不同电压等级和交流与直流的导线,不得穿入同一根管子。

同一交流回路的电线必须穿于一根钢管内

导线在管内不得有接头和扭结,其接头应在接线盒内连接

管内导线总截面积(包括外护层)不应超过管子截面积的40%

导线穿入钢管后,在导线出口处,应装护套线保护导线,在不

进入盒(箱)内的垂直管口,穿入导线后,应将管口密封。

⑥、绝缘电阻测定

绝缘电阻用摇表进行测量。绝缘电阻值取摇表lmin的稳定读数。吸收比是指表摇60s与l5s的绝缘电阻值的比值,即R60/Rl5;

⑦、配管及穿线质量应达到的优良标准

钢管敷设:在合格的基础上,线路进入电器设备和器具的管口位置正确;

管路的保护:在合格的基础上,盒(箱)内清洁无杂物,导线整齐,护套线

(护口、护线、套管)齐全、不脱落;

管、盒

(箱)及支架接地

(接零)支线敷设:在合格基础上,线路走向合理,色标准确,涂刷后不污染设备和建筑物。

(四)消防器具安装

①、消防器具应当配件齐全,无机械损仍、变形、油漆剥落、保护罩破裂等现象;

②、消防器具的运输和保管应符合国家有关物资运输、保管规定;

③、消防器具的安装,应在室内土建工作全面完成,并且房门可以关锁情况下安装,下班时要关锁

④、安装过程中,要注意保护顶棚、墙壁、地面不受污染、损伤;

⑤、消防器具的接线盒、木台等承重结构,一定按要求安装,确保消防器具的牢固可靠;

⑥、各种接线箱、盒的口边最好用水泥沙浆抹口。如盒、箱口离墙面较深时,可在箱口和贴脸之间嵌上木条,或抹水泥浆补齐,使贴脸与墙面平齐。洁净室内的箱、盒安装后应与壁板接合处做密封处理。对于暗开关、插座盒子沉入埔面较深时,常用的办法是垫上弓子(即

以φ1.2-1.6㎜的铁丝绕一弹簧),然后根据盒子的不同深度,随用随剪;

⑦、消防器具安装完成后,要对线路作一次全面检查,这对于防止利减少故障有很大作用。检查时应注意:

配电箱或开关板上各部件是否完整无缺

各部位的线头紧固件有无松动

线路有无过载过热现象

各种消防器具是否完整无损

各种路中保护接地和接零是否可靠

设备和导线上是否放有工具或其它物品

⑧验收时应检查下列各项内容:

成排安装的消防器具其中心轴线、垂直偏差、距地高度应符要求;

暗装消防器具的盖板应紧贴墙面,不同消防器具的安装应符合要求

检查明、暗配电箱(板)的安装和回路编号应符合要求;

(五)电气盘、箱、柜安装

①、盘、柜二次搬运

安盘、柜的重量及体形大小,结合现场施工条件,决定采取搬运方式,柜上有吊环者,吊索应穿过吊环;无吊环者,吊索最好挂靠在四角主要承力结构处,不允许将吊索挂在设备部件上吊装;

运输中要固定牢靠,防止碰撞避免元件、仪表及油漆的损坏;

②、盘、柜底座制作安装。盘、柜底座一般采用型钢

(角钢、槽钢)制作。钢材规格大小根据盘、柜尺寸和重量确定。型钢先矫乎矫直后再下料制作。固定底座用的底板,应由土建在施工基础或地坪时预埋。安装人员应配合或检查验收其预埋件的准确性。

③、盘、柜开箱。盘、柜达到现场后,在安装前应进行开箱检查。开箱检查下列内容,并认真填写好设备“开箱检查记录“经双方签字认可:

型号、规格符合设计要求,而且临时在盘、柜上标明名称、位号和安装位置;

随盘、柜上带来的零部件齐全,有全套出厂图纸及技术资料;

外观检查,设备无机械损伤,油漆光洁明亮;

制动部件灵活、准确。电气与支架接触紧密。

④盘、柜的安装应符合下列要求:

盘、柜的固定及接地要可靠,漆层完好,清洁整齐;

盘、柜内所装电气元件庇完好,安装位置正确,固定牢固;

所有二次接线应正确可靠,标志齐全、清晰;

盘、柜内一次部件的安装应符合规范要求;

操作及联动试验动作正确,符合设计要求

⑤、盘、柜安装质量应达到的优良标准:

盘、柜配线:在合格的堪础上,盘内母线色标均匀完整;二次接线排列整齐,回路编号清晰、齐全,盘内的引入、引出线路整齐;

盘、柜及其支架接地

(接零)支线敷设:在合格的基础上,线路走向合理,色标准确,涂刷后不污染设备利建筑物。

七、节能工程验收

1、居住建筑节能工程质量中各子分部与其各分项的工程质量验收应全部合格。

2、验收时,应检查的文件和记录:

(1)设计图纸和变更文件;

(2)设计与施工执行的标准、文件;

(3)材料、部品及配件的出厂质量合格证、技术性能检测报告、进场验收记录齐全;

(4)材料、部品及配件的抽检复试报告齐全;

(5)各检验批、分项、子分部的验收记录齐全;

(6)施工记录;

(7)各分项的隐蔽验收记录齐全;

(8)质量问题的处理记录齐全;

电线检验报告和检测报告范文第4篇

关键词建筑节能工程;要求;质量控制

为达到建筑节能设计要求的施工质量验收规范,我国在2007年1月颁布了《建筑节能工程施工质量验收规范》(GB 50411―2007),是第一部将节能工程作为一个分部工程纳入建筑节能分部工程。笔者结合多年工程实践经验,介绍了建筑节能工程的施工质量监控措施,供大家参考。

1 建筑节能工程的要求

(1)建筑施工单位须具备相应的资质,施工现场应建立、健全相应的质量管理体系、施工质量控制和检验制度,并具有相应的施工技术标准。

(2)图纸须符合建筑节能要求,设计变更不得降低建筑节能效果。当设计变更影响建筑节能效果时,须经原施工图纸设计审查机构审查。在实施前办理设计变更手续,并获得监理或建设单位的确认。建筑节能工程应按照审查合格的设计文件和审查批准的施工方案施工。

(3)节能保温工程应选用经过技术鉴定并推广应用的建筑节能技术和产品以及其他性能可靠的建筑材料和产品。严禁采用明令淘汰的建筑材料和产品。

(4)建筑节能材料和设备等进场验收时。要进行外观检查、质量证明文件核查和进场材料抽样复验(见证取样送检),复验项目应按《建筑节能工程施工质量验收规范》(GB 50411―2007)的要求进行。

(5)建筑节能工程应单独组卷。建筑节能分项工程和检验批的验收应单独填写验收记录。建筑节能分部工程质量验收合格的条件是:①分项工程全部合格,质量控制资料完整;②外墙节能构造现场实体检验结果符合设计要求;③严冬、寒冷和夏热冬冷地区的外窗气密性现场实体检测结果合格:④建筑设备工程系统节能监测结果合格。建设单位负责撰写《节能工程专项验收报告》及填写《北京市民用建筑节能专项验收备案登记表》上报建设主管部门。

(6)单位工程验收应在建筑节能分部工程验收合格后进行。节能保温施工质量验收不合格的居住建筑工程不得进行竣工验收、不得交付使用。

2 建筑节能工程施工前的控制

⑴资质审查。承担建筑节能工程的施工单位须具有相应的专业资质和安全生产许可证,项目部管理人员应有相应的资格证书,特种作业人员须持证上岗。

⑵施工图检查。建筑节能工程施工前。监理单位各专业的监理工程师要认真学习图纸,熟悉图纸内容、掌握工程情况。参加施工图设计交底和图纸会审,与《建筑节能工程施工质量验收规范》(GB 50411―2007)对照,提出问题和建议,检查图纸是否符合建筑节能规范规定和强制性标准条文要求。检查图纸是否通过施工图审查单位审查,检查节能使用的材料和设备是否符合现行国家规范的规定。

⑶建筑节能专项施工方案审查。建筑节能工程是一个整体系统程.总监理工程师要组织各专业监理工程师对各项节能施工方案从建筑、结构、通风与空调、水电安装等方面对照工程实际,审查节能范围是否确定,材料和设备复验是否明确,主要施工方法和措施是否符合建筑节能要求。

⑷编制建筑节能工程监理实施细则。监理单位要依据《建筑节能工程施工质量验收规范》(GB 5041l一2007)和设计文件,结合节能工程特点,编制切实可行的建筑节能工程监理细则,明确建筑节能监理流程。制订建筑节能监理专项制度,包括施工图审查制度、节能工程设计变更制度、节能材料验收制度和复验见证试验送检制度、节能工程隐蔽验收制度、节能检验批验收制度和节能工程验收制度。明确节能监理人员的职责。当节能工程有设计变更时,监理应针对设计变更内容修改监理细则。

3 建筑节能施工过程控制

凡进入施工现场的主要材料、建筑构配件、器具和设备,都要进 行验收。材料、设备是节能工程的物质基础。既要符合设计要求,又要符合国家相关标准、规范、规程和强制性条文规定。尤其是建筑节能保温材料和采暖、空调等机电设备的技术性能参数对节能效果的影响较大,须严格把关。

对进场材料进行复验时。其批量划分、试件数量、抽取方法、质量指标确定等,都须按产品相应标准规定执行。建筑节能采用的材料、设备等进场时应对下列性能进行复验(见证取样送检)。

(1)墙体节能工程:包括保温材料的热导率、密度、抗压强度或压缩强度,粘结材料的粘结强度,增强网的力学性能和抗腐蚀性能。

(2)幕墙节能工程:包括保温材料的热导率、密度,幕墙玻璃的可见光透射比、传热系数、遮阳系数、中空玻璃露点,隔热型材的抗拉强度和抗剪强度。

(3)门窗节能工程:包括严寒、寒冷地区门窗的气密性、传热系数和中空玻璃露点,夏热冬冷地区门窗的气密性、传热系数、玻璃遮阳系数、可见光透射比和中空玻璃露点,夏热冬暖地区门窗的气密性、玻璃遮阳系数、可见光透射比和中空玻璃露点。

(4)屋面节能工程:包括保温隔热材料的热导率、密度、抗压强度或压缩强度、燃烧性能。

(5)地面节能工程:包括保温材料的热导率、密度、抗压强度或压缩强度。

(6)采暖节能工程:包括散热器的单位散热量、金属热强度;保温材料的热导率、密度、吸水率。

(7)通风与空调工程:包括风机盘管机组的供冷量、供热量、风量、出口静压、噪声及功率,绝热材料的热导率、密度和吸水率。

(8)空调与采暖系统冷热源及管网节能工程:包括绝热材料的热导率、密度和吸水率。

(9)配电与照明节能工程:包括电缆、电线的截面和导体电阻值。

4 建筑节能工程验收

建筑节能工程的施工质量验收应在施工单位自行检查评定合格的基础上进行,由建设单位(监理单位)按检验批、分项、分部工程的顺序进行,参加施工质量验收的各方人员应具备规定的资格。

建筑节能分部工程验收前应进行实体检验,即通过外窗气密性现场检测、围护结构墙体节能构造实体检验、系统功能检验,确认节能工程质量达到设计要求和符合规定的合格标准。建筑节能工程验收时应对下列资料核查,并纳入竣工技术档案:(1)设计文件、图纸会审记录、设计变更和洽商;(2)主要材料、设备和构件的质量证明文件、进场检验记录、进场核查记录,进场复验报告、见证试验报告;(3)隐蔽工程验收记录和相关图像资料;(4)分项工程质量验收记录,必要时应核查检验批验收记录;(5)建筑围护结构节能构造现场实体检验纪录;(6)严寒、寒冷和夏热冬冷地区外窗气密性现场检测报告;(7)风管及系统严密性检验纪录;(8)现场组装的组合式空调机组的漏风量测试记录;(9)设备单机试运转及调试记录;(10)系统联合试运转及调试纪录;(11)系统节能性能检验报告;(12)其他对工程质量有影响的重要技术资料。

5 结语

在建筑节能工程施工过程中应按国家有关法律、法规的规定,重视施工中各环节质量控制和技术处理措施,在达到建筑节能工程应有的节能效果的同时,保证了工程质量。

参考文献

[1]许志中,曹双梅,郭红.我国建筑节能技术的研究开发与发展前景探讨. 工 业建筑,2004.4

电线检验报告和检测报告范文第5篇

关键词:建筑工程;防火封堵;对策

中图分类号: TU198 文献标识码: A

引言

受到现有的灭火技术影响,高层建筑及大型建筑的火灾扑救一直是灭火救援的难题。如何减少此类建筑火灾的发生、降低火灾发生后的人员伤亡和财产损失一直是当今消防科研的重要内容。因此,采用有效的防火封堵保护措施是非常必要的。

一、防火封堵材料

1、有机防火堵料:(俗称“防火泥”)一以合成树脂作粘接剂,配以防火剂、填料等而成的材料,具有可塑性和柔韧性;可以切割、搓揉,封堵各种形状的孔洞,施工、维修比较方便。主要用于管道或电线、电缆贯穿孔洞的防火封堵中,多数情况下与无机防火堵料、阻火包配合使用。

2、无机防火堵料:一以快干水泥为基料,配以防火剂、耐火材料等混合而成。该防火堵料无毒、无味,有较好的耐水、耐油性能。施工方法简单,产品对管道或电缆贯穿孔洞,尤其是较大的孔洞、楼层问孔洞的封堵效果较好。

3、阻火包:将防火材料包装制成的包状物体,适用于较大孔洞的防火封堵或电缆桥架的防火分隔(阻火包亦称耐火包或防火包)。

4、阻火模块:用防火材料制成的具有一定形状和尺寸规格的固体,可以方便地切割和钻孔,适用于孔洞或电缆桥架的防火封堵。

5、防火封堵板材:用防火材料制成的板材,可方便地切割和钻孔,适用于大型孔洞的防火封堵。

6、泡沫封堵材料:注入孔洞后可以自行膨胀发泡并使孔洞密封的防火材料。

7、防火密封条:用防火材料制成的具有一定几何形状的制品或柔性卷材。

8、防火密封胶:具有防火密封功能的液态防火材料。

9、阻火包带:用防火材料制成的柔性可缠绕卷曲的带状产品,缠绕在塑料管道外表面,并用钢带包覆或其它适当方式固定,遇火后膨胀挤压软化的管道,封堵塑料管道因燃烧或软化而留下的孔洞。

10、阻火圈:用防火材料和金属外壳制成的制品,套在塑料管道的外表面,遇火后膨胀并封堵塑料管道穿过墙面、楼地板等孔洞时因燃烧或软化而留下的孔洞。

在国内已开发成功并大量应用于防火封堵工程的建筑防火封堵材料,主要是通过添加卤素阻燃剂来获得优良的阻燃性。在火灾发生时,虽然卤素材料有良好的阻燃效果,但是会释放出大量的烟雾和氯化氢气体。这些烟雾和氯化氢气体会刺激人眼和呼吸系统,阻碍消防人员和救援人员的灭火和抢救工作,并可导致单纯由火所不能引起的电器系统开关和其他金属物件的腐蚀。近几年来,越来越多的国家已制定或颁布法令,对某些制品进行燃烧毒性试验或对某些制品的使用所释放的酸性气体做出规定,取代卤素阻燃剂,开发无卤阻燃剂已成为世界阻燃材料领域的发展趋势。防火涂料技术发展的关键部分是阻燃剂,近年来,高分子阻燃技术的研究和阻燃产品的开发应用已受到各界重视。

二、防火封堵材料生产厂家和施工质量现状

虽然国家相关规范对防火封堵有明确的规定,但在工程中往往执行不严,建筑单位也存在着侥幸心理,敷衍了事,对于建筑中出现的新材料、新工艺,现行规范滞后,没有明确规定。目前存在的主要问题有:

1、部分施工单位挂羊头卖狗肉,向建设单位及消防监督部门提供合格厂家的市场准入资料,而工程实际中却使用假冒伪劣产品,由于封堵材料的产品特性,从外观上很难确认厂家信息。

2、施工单位、监理单位对封堵材料的消防产品身份信息标志检查不到位,或者根本就不进行检查确认。部分生产单位未能严格执行国家消防部门强制要求的防火封堵材料消防产品身份信息标志的 A,B签管理。

3、施工单位不具备消防施工资质,现场施工人员未经过施工技术培训,不按照防火封堵的技术规程施工。

4、部分工程现场仅在表面做一个封堵假象,而其他部位,如桥架内部、楼板孔洞处等未做实际施工,骗取验收通过;电缆井、管道井等贯穿孔洞处未按规范要求用相当于楼板耐火极限的防火材料作防火分隔,与房间、走道等相连通的孔洞,其空隙没有采用防火材料填塞密实;母线(线槽)井使用无机堵料或者水泥浇筑,甚至使用钢板,留下事故隐患;工程现场桥架内部封堵随意或不封堵;高配房等重要部位未考虑防范小动物破坏因素。

5、工程验收流于形式,监督人员对工程中的封堵情况只看表面情况,未进行细致的检查。甚至有的消防监督人员对封堵情况根本就无暇顾及。

三、防火封堵措施及施工

防火封堵是指用防火堵料对建筑、尤其是高层建筑的管道井、强弱电桥架等,在火灾发生时容易形成类似烟囱的地方进行防火封堵,从而隔断火源不串往其他楼层或其他防火分区,以达到减小火灾损失的目的。

1、常见的防火封堵部位

(1)管道井;

(2)电缆(桥架)、母线、管道穿墙、穿楼板孔洞,电缆桥架阻火段;

(3)U-PVC塑料管道穿楼板、墙处;

(4)其他孔洞与缝隙。

2、施工要求

(1)一般规定

施工应按设计文件和有关产品的技术说明进行。施工人员应经过专业技术培训,持证上岗。施工前对封堵材料逐一查验规格、数量及检验报告和合格证。并作详细记录。施工过程中对隐蔽工程应在封闭前由建设、监理等单位检查认可,做好隐蔽工程施工记录。

(2)贯穿部位防火封堵

①不燃材料贯穿孔的防火封堵应用相当于穿过分隔体耐火极限的无机材料将贯穿物周围的孔洞填充。孔洞较大时应作配筋处理,使填充部分与分隔体具有相同的强度。水平分隔体贯穿部位缝隙较大时,应用与分隔体相同耐火极限的防火板在底部衬托,填充物应牢固。

②电缆贯穿孔的防火封堵应严格按相关要求,用砂浆或混凝土填充穿孔,其余部分孔隙应用受热膨胀型的防火堵料严密封堵。电缆有桥架保护时,应拆除桥架盖板,将防火堵料填塞至电缆,不得有任何缝隙。

③塑料管道贯穿孔进行防火封堵时,分隔体内预埋阻火圈的,塑料管道敷设后,将贯穿部位的孔隙用砂浆或防火泥严密封堵。阻火圈非预埋的,应将贯穿部位的孔隙用砂浆或防火泥严密封堵,并在易受火灾威胁部位安装阻火圈。

(3)结构缝防火封堵

结构缝应用塑性防火材料严密填塞,并固定牢固。

3、施工常见问题

虽然国家规范对防火封堵有明确的规定,但在工程中往往执行不严,常见的主要问题有:

(1)电缆井、管道井等在穿过楼板处未按规范要求用相当于楼板耐火极限的不燃烧体作防火分隔,与房间、走道等相连通的孔洞,其空隙没有采用不燃烧材料填塞密实;(2)建筑中的墙头缝、楼板与外墙之间的缝隙等部位未封堵;(3)有些玻璃幕墙与每层楼板、隔墙处的缝隙未封堵或未严密填实;(4)电线、电缆穿过防火分隔墙的孔洞未封堵;(5)高层建筑中使用的塑料给排水管穿过楼板、防火墙时未设阻火圈等等。

4、验收要求

(1)设计图纸、隐蔽工程记录、产品检测报告、产品合格证,其他按规定需提交的文件。

(2)有机防火堵料封堵应牢固严实,无脱落现象,表面应平整光洁。

(3)无机防火堵料封堵表面应平整光洁,不得有粉化,不硬化、开裂等缺陷。

(4)阻火包的堆砌应密实牢固,对侧面以不透光为合格,外观平整美观。

(5)阻火包带按叠加一半的规定均匀缠绕,不应有松开现象。

四、建筑工程防火封堵对策

防火封堵体系是目前国内在整体消防体系中较薄弱的环节,无论在消防设计还是施工中都存在不系统、不明确的状况,因此在设计、施工、验收及维护各个环节都应严格把关,现特提出以下几点建议:

1、施工单位应向建设单位及消防监督部门提交防火材料市场准入资料、质量合格报告、施工现场质量查验结果、施工资质、消防产品身份信息标志 A,B签等相关资料及相应发票。

2、建设主管部门在对设计人员和项目经理的培训时应重视对规范的理解和消化,提高对施工要求的认识。

3、建立年度专项检查制度,加强对防火封堵的维护保养,将防火封堵部位的检查列为消防设施检测的内容之一,出现不合格项应及时责令整改。

4、施工单位必须具备消防工程施工资质,规范施工工艺,制定施工及验收规程。对施工人员必须参加施工技术培训,考试合格方可上岗。

结束语

综上所述,在建筑工程中防火封堵工作是一项较为复杂,却又十分重要的工作。因此,相关工作人员应从各个方面着手,加强防火封堵工作,只有这样才能建造出安全的建筑。

参考文献

电线检验报告和检测报告范文第6篇

一、编制依据与原则.................................................................................................... 1

1.1 编制依据......................................................................................................... 1 1.2 编制原则......................................................................................................... 1 二、工程概况................................................................................................................ 2

2.1 地形、地貌、地质条件................................................................................. 2 2.2 气象、水文..................................................................................................... 2 2.3 工程简介......................................................................................................... 3 2.4 人员准备......................................................................................................... 4 2.5机械准备.......................................................................................................... 5 2.6 施工便道准备................................................................................................. 5 2.7 场地准备及材料准备..................................................................................... 6 2.8 施工进度计划................................................................................................. 6 三、施工工艺................................................................................................................ 6

3.1工艺流程.......................................................................................................... 6 3.2施工方法.......................................................................................................... 6 3.3注意事项........................................................................................................ 13 四、质量控制.............................................................................................................. 14

4.1质量目标........................................................................................................ 14 4.2质量组织机构................................................................................................ 14 4.3质量保证体系................................................................................................ 14 4.4质量保证措施................................................................................................ 15 4.5质量检查人员和自检制度............................................................................ 17 4.6质量通病及防范措施.................................................................................... 18 五、安全保证.............................................................................................................. 20

5.1安全目标........................................................................................................ 20 5.2安全保证体系................................................................................................ 20 5.3安全保证措施................................................................................................ 22 六、环境保护及文明施工.......................................................................................... 23

6.1 环保施工目标............................................................................................... 23 6.2 环境保护体系............................................................................................... 23 6.3 环境保护措施............................................................................................... 24 七、文明施工措施...................................................................................................... 25

7.1 文明目标 ...................................................................................................... 25 7.2文明施工体系框图........................................................................................ 25 7.3 管理措施....................................................................................................... 25 7.4 文明施工措施............................................................................................... 26 八、季节性施工保证措施.......................................................................................... 27

8.1雨季施工保证措施........................................................................................ 27 8.2夏季高温期的施工措施................................................................................ 28

桥梁防撞护栏施工技术方案

一、编制依据与原则

1.1 编制依据

1、《中华人民共和国环境保护法》; 2、《公路工程技术标准》(JTG B01-2014); 3、《公路工程施工安全技术规范》(JTG F90-2015); 4、《公路工程质量检验评定标准》(土建JTGF801-2004); 5、《公路桥涵施工技术规范》(JTG/T F50-2011); 6、《施工现场临时用电安全技术规范》(JGJ 46-2005); 7、《建筑机械使用安全技术规程》(JGJ 33-2012);

8、《重庆市公路工程质量控制强制性要求》(渝交委„2015‟79号); 9、《重庆市公路水运工程安全生产强制性要求》(渝交委„2015‟81号); 10、重庆九龙坡至永川高速公路JY1合同段《两阶段施工图设计》; 11、《公路工程施工工艺标准》中交一公局;

12、《中交第一公路工程局有限公司施工方案管理办法》; 13、我部《实施性施工组织设计》;

14、我项目对施工现场和周围环境调查掌握的有关资料。 1.2 编制原则

1、在充分理解设计文件的基础上,以设计图纸为依据,采用先进、合理、经济、可行的施工方案。

2、整个工程全过程对环境破坏最小,采取必要环境保护措施,避免周围环境的破坏。

3、充分应用先进的科学技术和施工设备,做到机械化作业、标准化作业、流水作业,坚持技术先进性、科学合理性、经济适用性、安全可靠性相结合原则。

4、强化质量管理,树立优良工程观念,创一流施工水平,创精品工程。

5、实施项目法管理,通过对劳务、设备、材料、资金、方案、信息、时间与空间

条件的优化处臵,实现成本、工期、质量及社会效益的预期目标。

二、工程概况

2.1 地形、地貌、地质条件

本段为构造侵蚀剥蚀丘陵地貌,形态上可分为桌状丘、条状丘、浑圆状丘,丘陵的类型和形态,与构造、岩性和流水的切割密切相关,线路范围内地形起伏不大,沟谷一般发育,切割深度一般15~30m ,坡角一般15~30°,地面高程355.0~430.0m ,相对高差25-80m 。斜坡区多基岩出露,或覆盖较薄第四系土层,沟谷底及平缓低洼地带分布少量厚1~5m 第四系土层,下伏地层为侏罗系下统珍珠冲组、自流井组、新田沟组、中统沙溪庙组,岩性为砂、泥岩、页岩,构造位于北碚向斜西翼、温塘峡背斜东翼,岩层产状平缓,倾角10°~44°,岩层倾角向温塘峡背斜核部逐渐变陡,发育两组裂隙,强风化层厚度1~3m ,中风化岩体较完整。地下水主要为松散岩类孔隙水和基岩裂隙水,位于斜坡区,排泄条件良好,地下水多贫乏。沿线其余段无滑坡、崩塌、泥石流等不良地质现象发育。该路段区场地整体稳定,适宜路线布设和修建构筑物。

主要工程地质问题:桥台基坑壁被裂隙切割的岩块可能会沿裂隙面滑塌,局部桥台基坑边坡为顺向坡,应加强临时支护和防治;沟谷地带土体厚度较大,受地表水影响,挡块挖孔桩施工坑壁易坍塌,应加强防治;路堑边坡开挖,岩层产状平缓,受裂隙切割控制,易沿裂隙面产生掉块,应加强防治;高填路堤建议分阶放坡护面,回填前应首先进行软基处理后,方可进行填方施工,还应设臵完善排水系统;一般路基段局部地段存在软土,但厚度不大,建议排水、换填或抛石挤淤处理。

2.2 气象、水文

项目区属亚热带潮湿气候,具有四季分明,气候温和,雨量充沛,冬暖夏热,风小湿大等大陆性季风气候特征。年降水量多集中于夏季,冬天少见霜雪。

九龙坡区年气温为多年平均17.5℃、极端最高42.2℃(2006年8月15日) 、极端最低-3.7℃(1991年12月26日至28日) ;年降水量多年平均1064.8mm 、最大年1497.4mm (1956年)、最小年740.7mm (1958年),多年平均最大日降水量104mm 。年内降水分布极为不均,5~9月的降水量占全年的68.4%以上,降水日数以10月最多,次为4~6月。风向主要为北东风,平均风力1.6~2.1级,最大达8级。云雾多,年平均为67.8d ,最多可达148d 。

江津区多年平均气温为18.1°C ,极端最高气温为42.4°C(1995.9.6),极端最低气

温为-2.5°C (1975.12.5)。多年平均降雨量1185mm ,主要集中于每年5~8月,占全年降水量的75%。

2.3 工程简介

中交一公局重庆九龙坡至永川高速公路(成渝高速公路扩能)JY1合同段全线共有桥梁十六座,防撞护栏29联,护栏共计4880m ,所有防撞护栏形式都为墙式护栏,桥梁防撞护栏设臵原则为①桥跨部分:桥梁内外侧均采用护栏座(B=50cm)的加强型钢筋混凝土墙式护栏,现浇箱梁施工时注意预埋钢筋。②U 形台侧墙顶钢筋混凝土护栏的设臵与桥跨部分形式一样,但钢筋锚固形式不同,浇筑桥台时,应注意预埋钢筋。桥梁防撞护栏混凝土采用C30砼,钢筋主筋为C 16。桥梁防撞护栏工程数量统计如下表1所示:

表1 桥梁防撞护栏工程量

桥梁防撞护栏材料统计如下表所示。

表2 桥梁防撞护栏每1.5延米材料统计表

注:括号内为桥台护栏,括号外为桥跨护栏材料数量。

桥梁防撞护栏断面图如下所示:

图1 防撞护栏一般构造图

2.4 人员准备

按施工进度计划安排,具体人数表如下所示。

表3施工人员配臵表

2.5机械准备

按照机械设备使用计划,对所有机械及设备进行检修及调试,并定时保养,使其保持良好的待用状态。对工程中所用的各种计量设备送有关部门进行标定并取得合格证书。

根据现场施工要求,安排性能好的机械设备进场,并对进场设备进行必要的维护与保养,以保证设备正常运转。具体机械设备如下表所示:

表4桥梁防撞护栏施工主要机械设备表

2.6 施工便道准备

我标段沿线地形起伏不大、可利用地方道路较多,便道方案选择明确,主要是利用现有水泥道路,局部根据实际情况征用临时用地,设臵加宽段,以满足施工需要。具体情况如下表所示:

表5 便道基本情况介绍

2.7 场地准备及材料准备

本标段便道通顺,施工便利。现浇箱梁顶板钢筋绑扎时开始绑扎护栏预埋钢筋。根据现场施工进度要求,对所有进场的原材料必须经过甲方、监理、施工三方验收,未经验收或者验收不合格的原材料、设备、构配件严禁用于工程,无检测报告不得施工。验收合格后,合理组织材料进场施工。

2.8 施工进度计划 施工进度计划如下表所示。

三、施工工艺

3.1工艺流程

桥梁防撞护栏施工工艺:精确放样凿毛、预埋筋调整钢筋制作安装及预埋件模板安装浇筑混凝土拆模养生,具体施工工艺流程图如下所示:

图2 防撞护栏工艺流程图

3.2施工方法 3.2.1测量放样

为保证现浇箱梁顶面高程符合设计要求,桥梁防撞护栏施工之前,测量人员必须复核顶面高程。用全站仪进行平面位臵放样,每5米放出防撞护栏内外边缘。按照四等水

准测量要求将高程点引上桥面,并用自动精平水准仪对放出的各桩进行高程测量。

3.2.2钢筋加工及安装

钢筋安装前先对梁面进行清理,凿除浮渣、浮浆并用水冲洗干净。然后根据放样数据拉线定位钢筋安装的位臵及高程。按照图纸要求,钢筋采用绑扎连接,按照桥规有关要求进行质量控制。施工时特别要注意控制好钢筋顶面高程以及线形。

1、材料准备

(1)按照工程进度要求,编制材料进场计划。

(2)钢筋进场后,检查其牌号、等级、规格、生产厂家是否与合同相符,产品外观是否受损,并检查出厂质量合格证书和质量检验报告单。无合格证书和质量检验报告单的钢筋不予验收。

(3)钢筋进场验收后,按种类、型号、规格、等级及生产厂家分别堆存,不得混杂,并设立标志牌,钢筋堆存在仓库(棚)内,如钢筋露天堆臵时,应垫高并加遮盖,防止淋雨锈蚀和其它污染,影响钢筋质量。

(4)及时对进场钢筋按规定抽检频率进行试验,并报请监理进行抽检,在材料标识牌上标明钢筋材料的检验状态,是否检验合格,严禁将不合格钢筋用于工程施工。

2、钢筋加工安装

(1)钢筋成形采用钢筋成形设备在钢筋场内进行,成形时严格按施工图纸尺寸对接长钢筋接头打弯、对箍筋进行弯曲。防撞护栏钢筋布臵图如下所示:

图3 墙式护栏钢筋布臵图(一) 墙式护栏钢筋布臵图(二)

(2)主筋接长采用搭接电弧焊,两钢筋搭接端部预先折向一侧,使两接合钢筋轴线一致,接头双面焊缝的长度不小于5d ,单面焊缝的长度不小于10d (d 为钢筋直径);箍筋采用绑扎连接,用双丝进行绑扎,以保证钢筋的稳定性。钢筋接头与钢筋弯曲处的距离不应小于10d ,也不宜位于构件的最大弯矩处。

(3)钢筋连接件处的混凝土保护层宜满足设计要求,且不得小于15mm ,连接件之间的横向净距不宜小于25mm 。

(4)钢筋焊接前应根据施工条件进行试焊,合格后方可进行正式施焊。焊工必须持考试合格证上岗。钢筋焊接的接头形式、焊接方法、适应范围应符合《钢筋焊接及验收规程》(JGJ-18)的规定。焊条采用THJ502碳钢焊条,其化学性能如下:

表7 THJ502碳钢焊条化学性能

(5)钢筋安装前,应用先全站仪对护栏内、外边线进行精确定位放线,以确保护栏线条顺畅。然后按照护栏底面标高要求。为保证护栏与桥面连接牢固,应按要求进行凿毛处理。

(6)钢筋安装时,应先确定起始点和结束点钢筋顶面标高,然后在起始点位臵挂线至结束点,最后根据挂好的标高线进行钢筋绑扎或焊接;绑扎焊接时,为保证安装质量应根据实际情况对预埋钢筋进行调整。

(7)钢筋保护层设臵,钢筋保护层垫块采用梅花形混凝土垫块,其强度不小于防撞护栏混凝土强度,以1米左右的间距呈梅花形布臵,用箍丝将塑料垫块在钢筋上绑扎牢固,防止在模板安装时保护垫块发生滑动或移位。

(8)钢筋加工及安装检查标准如下表所示:

表8 钢筋加工及安装检查标准表

(9)施工质量标准及要求

①钢筋、机械连接器、焊条等的品种、规格和技术性能应符合国家现行标准规定和设计要求。

②钢筋的机械性能必须符合规范要求,钢筋平直,表面不应有裂皮和油污。 ③受力钢筋同一截面的接头数量、搭接长度、焊接和机械接头质量应符合施工技术规范要求。

④钢筋安装时,必须保证设计要求的钢筋根数。 ⑤受力钢筋应平直,表面不得有裂纹及其它损伤。 3.2.3模板安装

模板要符合结构尺寸,保证有足够的强度和刚度,并要装拆方便。 1、模板加工

(1)模板采用特制钢摸,由面板、纵横加劲肋、背楞等组成,强度、刚度和稳定性满足施工要求。

(2)模板在工厂分节制造,每节长度1.5m 。相邻模板间设普通螺栓连接。 (3)模板的拼装,宜采用组装胎具定位及合理的焊接顺序。

(4)模板加工毛刺、焊渣要清理干净,除锈要彻底,防锈涂漆刷均匀。

(5)模板加工要求各部位焊接牢固,焊缝尺寸符合要求,焊缝外型应光滑、均匀,不得有漏焊、焊穿、裂纹等缺陷,不得产生夹渣、开焊、气孔等缺陷。面板结构尺寸应精准,且线形应流畅。

(6)模板使用前须进行现场组拼、编号,并分规格堆放。

2、模板试拼:栏身模板采用厂制定型钢模,每节长度1.5米,节与节之间采用普通螺栓固定连接。模板运抵现场后进行试拼,主要是看模板安装后的整体效果,模板接缝处是否平顺,有无缝隙和明显错茬,检查无误后方可正常使用。

3、模板安装前的检查准备工作

(1)模板安装前,应先检查钢筋的绑扎以及预埋件的安装质量;并应检查模板板面是否平整、光洁、有无凹凸变形,并清除模板上的灰碴和管道孔内的杂物;检查模板焊缝处是否有开裂破损,如有均应及时补焊、整修合格。

(2)模板与混凝土接触面上应涂脱模剂,脱模剂可采用厂制专用脱模剂,严禁使

用废机油、废柴油混和物作脱模剂。涂刷脱模剂时应注意油量少而均匀,做到不漏涂而板面又不积聚。

(3)模板安装前应检查各预埋管处开孔位臵是否准确,凿毛是否符合要求。模板安装尺寸允许误差应符合下表要求。

表9 模板安装允许误差表

4、模板安装:

(1)模板安装、加固、拆除采用防撞栏模板专用台车,(HLTC-V3.0型)防撞栏专用台车具有便于操作、安全可靠、功能齐全、提高效率和降低施工成本的优点。台车自重6吨(不含配重),前臂长5米,有效行走距离为4.5米,总高度4.5米,有效提升高度为3.5米,单柱最大起重量为2吨,驱动行驶速度为15米/分钟。(见下图HLTC-V3.0型)。

(2)桥梁防撞栏模板采用定型钢模,单片长度为1.5米。加固方式为内侧拉杆配合

外侧支撑。端头模板同样采用定型钢板,固定方式为高强螺栓。同时防撞栏的断缝同样采用定型钢板,拆模后的断缝为2.5cm 宽的真缝,充分保证防撞栏混凝土不开裂、外观质量良好。模板安装顺序为先内侧后外侧。内外模板安装时紧贴混凝土底座并用螺栓拉杆拉紧连结,下部及顶部各设臵两道拉杆,间距80cm 。待内外侧模板都装完后,应进行模板垂直度和线形的精确调整,直至符合规范要求。护栏模板安装完成后,务必对模板检查,主要是检查安装尺寸是否合适,各个固定点(拉杆、支杆等)是否牢固可靠,护栏模板顶面标高和垂直度控制是否在规范允许的范围内,以保证模板的线型满足要求,对超出标准的地方进行相应调整;模板必须采用可靠的拼缝止水措施,确保模板不漏浆,模板安装好后,必须清理干净,才能移交给下一道工序。

(3)使用过的模板必须经过清洁处理后才能重新拼装使用。预留孔洞,(如吊点洞)预埋件的模板要确保位臵准确,稳定可靠。模板的支撑,必须有足够刚度和强度,支承部位必须牢固可靠。脱模剂涂刷均匀,并且不能污染钢筋及预埋件。在混凝土浇注过程中,必须派木工值班,密切注意模板的支载情况,发现问题及时处理。

(4)支模完成后在底模板下口抹好堵缝砂浆,保证下口严密。 3.2.4砼浇筑

1、浇注混凝土前,应对模板、钢筋和预埋件进行检查,并作好记录,符合设计要求后方可浇注。模板内的杂物、积水和钢筋上的污垢应清理干净。模板如有缝隙,应填塞严密。

2、混凝土采用C30商混,混凝土在商混站拌和好后采用混凝土搅拌车运输至现场,吊机在桥面进行垂直运输。混凝土入模以不发生混凝土离析控制为度,控制混凝土自由倾落高度不超过2m 。混凝土浇筑采用由一端向另一端斜向分层浇筑方法。用插入式振捣棒进行振捣。

3、混凝土应经试验取得外观最佳的配合比用于护栏施工,混凝土浇筑采用分部分三层斜向浇筑的方法,第一层控制在25cm 左右,第二层浇注到护拦顶35cm 左右,然后浇注到护拦顶。浇注时振动棒要快插,慢拔,以便使气泡充分逸出。振动棒要插入已振完下层混凝土5cm ,从而消除分层接缝;插点要均匀排列,顺序进行,并掌握好振捣时间,一般每插点为30秒左右,以混凝土表面平坦泛浆,不出现气泡为准。严禁过振,避免混凝土表面出现鱼鳞纹或流沙,泌水现象而影响外观。另外振捣时应严禁碰撞模板,以免模板损伤,影响外观质量。

4、混凝土布料采用人工布料,且不宜布料太满,边布边振,否则斜面气泡较多。在每浇注一段护栏后,要及时派专人进行收浆抹面,抹面时注意保证护栏顶面的平整度。

5、浇注混凝土时,按图纸要求原则上在墩顶位臵设1厘米断缝,沿着护栏每8~10米设臵一条断缝。

6、灌注混凝土过程中,按试验要求取做试件,用于检测混凝土的质量。 3.2.5混凝土养护

(1)混凝土浇注完成后,进行混凝土养护,混凝土面有模板覆盖时,采取洒水养护,并使模板保持湿润,且混凝土顶面加盖无纺土工布洒水养护,但在开始养生前,覆盖物不得接触混凝土面。模板拆除后,采用塑料薄膜包裹墩身方法养护。

(2)混凝土养护时间一般为7天。

(3)混凝土强度达到2.5Mpa 前,不得使其承受行人、运输工具、模板、支架及脚手架等荷载。

3.2.6模板拆除

模板拆除期限应在混凝土强度能够保证其表面及棱角不致因拆模而受损坏时方可拆除,一般应在混凝土抗压强度达到2.5MPa 时方可拆除侧板,模板拆除时,不允许用猛烈地敲打放强扭等方法进行,严禁抛扔。拆除后,应及时进行维修整理,分类妥善存放。

混凝土拆模完成后,对混凝土表面做局部修整,使混凝土表面光洁。发现表面有缺陷时,方案报监理工程师批准后再进行修饰。

3.2.7护栏施工质量检验标准 1、基本要求

(1)混凝土所用的水泥、砂、石、水及外掺剂的质量、规格必须符合有关规范的要求,按规定的配合比施工。

(2)混凝土护栏预制块件在吊装、运输、安装过程中,不得断裂。 (3)各混凝土护栏块件之间、护栏与基础之间的连接应符合设计要求。

(4)混凝土护栏块件标准段、混凝土护栏起终点及其他开口处的混凝土护栏块件的几何尺寸应符合设计要求。

(5)混凝土护栏的地基强度、埋入深度应符合设计要求。

(6)混凝土护栏块件的损边、掉角长度每处不得超过20mm ,否则应予及时修补。

2、实测项目(见下表所示)

表10 桥梁防撞护栏实测项目

3、外观质量

(1)混凝土护栏块件之间的错位不大于5mm 。

(2)混凝土护栏外观、色泽均匀一致,表面的蜂窝麻面、裂缝、脱皮等缺陷面积不超过该面面积的0.5%;深度不超过10mm 。

(3)护栏线形适顺,直线段不允许有明显的凹凸现象,曲线段护栏应圆滑顺畅,与线形协调一致。中央分隔带开口端头护栏尺寸应与设计图相符。 3.3注意事项

1、施工过程中实行防撞墙施工工艺流程卡制度,对每道工序都进行严格检查,并作好记录。做到上道工序不清,下道工序不接。通过层层工序的控制,保证产品质量的达标。

2、在质量管理工作中,落实岗位质量责任制,做到分工明确,责任到人。严格执行各项质量管理制度。

3、钢筋控制上,钢筋型号数量应满足设计要求,绑扎牢固,扎丝头向内弯曲,砼保护层厚度在35mm 到40mm 之间。工班只有在征得质检人员的许可下方能切割钢筋。横隔挡的钢筋绑扎要保证砼振捣时插入式振捣器能顺利插入振捣。

4、模板修整应注意除锈清灰刷脱模剂,检查模板变形情况。安装时每节模板间尽量密贴,防止漏浆。穿拉杆的PVC 管必须下口切平,塞入海绵,并拧紧防止PVC 管上浮用的平垫螺母。施工中防止破裂漏水。

5、模板与模板间的间隙一定要利用泡沫胶封死,以防漏浆

四、质量控制

4.1质量目标

分项工程验收合格率100%; 分部工程优良率达到97%以上; 单位工程优良率大于96%; 竣工验收质量评定90分以上;

杜绝质量事故发生,通过教育培训基本消除质量通病。 4.2质量组织机构

建立工程质量控制组织机构图如下。

图4 质量控制组织机构图

4.3质量保证体系

成立以项目经理为组长的质量管理领导小组,项目经理为质量管理的第一责任人,项目总工程师为质量管理的主要责任人,质检部为主要责任部门,以质检部为核心主抓施工质量,相关部门积极配合,从思想、组织、人员、技术、制度、措施、施工等涉及质量因素各方面抓起,有针对性地制定出详细的质量保证措施和质量控制办法。

图5 质量保证体系图

4.4质量保证措施

1、制度管理:(1)强化质量教育,增强全员创优意识,建立工程质量管理责任制。(2)加强组织建设,严格质量管理制度,制定创优规划完善质量保证体系。(3)坚持标准化管理,强化计量工作完善检测手段,积极开展QC 小组活动。

2、技术管理:(1)认真核对设计文件和图纸资料,切实领会设计意图,查找是否有丢、错、漏现象,及时会同设计、监理和建设单位解决所发现的问题。(2)认真进行技术交底。图纸会审后,由项目部的总工程师、施工技术科、工程队技术主管、单项工程技术主管逐级进行书面及口头技术交底,确保操作人员掌握各项施工工艺及操作要点、质量标准。(3)施工过程中要做好详细记录,各种原始资料搜集齐全,用以组织后期施工,编制竣工文件,并进行施工技术总结。(4)组织工程技术人员学习、熟悉合同文件及有关技术规范、标准和操作规程,领会设计图纸的意图。编制好桥梁防撞护栏施工细则,推广应用新技术、新材料;依靠科技进步提高工程质量,加快施工进度。认真研究图纸,详细制定各分项工程的施工方案。

3、现场管理:(1)每个施工点坚持有施工员旁站管理,严格按操作规程施工;特殊工种人员持证上岗,管现场的施工员要认真做好施工日志、填好施工原始记录。定期召开工地会议,协调解决施工中出现的质量问题,总结经验教训,保证质量体系的有效运行。(2)采用同厂家、同品牌、同标号的水泥,保证混凝土外观颜色一致。(3)模板面涂刷脱模剂,保证混凝土面平整光滑。(3)在钢筋外侧设臵混凝土垫块,保证有足够的保护层,防止露筋现象。(4)严格控制混凝土的配合比及塌落度,安排有施工经验的混凝土振捣工,掌握混凝土的振捣时间、振捣范围,振捣时振动器避免触及模板。(5)不能过早的拆除模板,待混凝土达到拆模强度后,再拆除模板,并及时洒水覆盖养生。(6)严格测量制度,放样时采取换手复测,确保结构物位臵及几何尺寸的正确性。(2)施工采用标准、优质模板,并保证模板的加工精度,同时采用较强刚度、强度的支撑,防止跑模现象。(3)随时检查模板及支撑情况,并随时进行监测,发现有跑模、胀模趋势,及时采取加固措施。

4、外购材料的质量控制:(1)严格控制用于工程结构的材料质量。对进场材料的类别、型号规格、数量和质量指标等进行验证和检验,特别是所使用的钢筋是否复核规范要求,并按规定要求进行抽检,杜绝不合格品进入施工现场。对于材料堆放场地要进行硬化,防止泥土被污染,各种进场材料按规定进行标识。(2)合理进行不同级别的混凝土配合比设计。根据图纸规定混凝土设计强度等级,由工地实验室进行混凝土强度试配。在配合比并得到监理工程师批准后方可浇注混凝土。(3)设臵自动计量混凝土拌和设备。按照重量比控制混凝土的各种材料投入量,同时控制拌和时间。(4)混凝土分层连续浇注,分层厚度符合技术规范规定,混凝土由高处下落的高度大于2m 时,

采用导管或溜槽。配备足够数量的处于良好状态的振捣器,振捣器要垂直地插入混凝土内,并插至前一层混凝土,保证新浇混凝土与先浇混凝土结合良好。

5、工程质量的检验:施工中严格执行检验制度,按技术规范要求操作,为工程施工提供科学依据。每道工序经检验合格后,方可进行下道工序施工。分项工程完工后,按工程质量检验评定标准进行自检评定;同时,配合监理工程师对工程质量进行抽检。

6、桥梁防撞护栏的施工过程中,由于防撞墙底宽上窄,其内部的钢筋布臵较密,浇注混凝土施工时不利于排除气泡,所以对混凝土的和易性有较高的要求。在大多数情况下,和易性的好坏取决于混凝土配合比设计。

7、浇筑防撞墙的混凝土坍落度宜控制在16~18cm ,如果泵送,其坍落度宜控制在18~20cm 范围内。

8、对于防撞墙拆模后出现的一些比较明显的表面缺陷还应进行必要的修饰。 4.5质量检查人员和自检制度

1、以项目经理为组长总工为副组长领导质检部和工程部建立质量检查小组对防撞护栏的施工进行定期检查和日常检查。

(1)定期检查

质量检查小组每月定期组织进行桥梁防撞护栏工程质量检查。检查内容有施工质量情况,技术资料,验标,规章制度执行情况、施工中的薄弱环节和质量通病、安全文明施工等。有针对性地检查工程质量中存在的典型问题,找出影响工程质量的主要因素,采取有力措施,及时整改,做好记录。

(2)日常检查

质检部及各班组专兼职质量检查人员对日常的施工质量情况随时进行检查和指导,并按要求做好有关记录。检查范围:工序检查;原材料、半成品、成品等按规定检验试验情况;相关记录是否齐全和其他可能影响产品质量的检查。

2、建立自检制度

(1)桥梁防撞护栏施工现场生产作业严格贯彻国家或部颁施工规范标准,按照施工现场已经批准的施工工艺细则合理组织施工。

(2)桥梁防撞护栏各施工工序必须做到井然有序,每道工序在施工完成后均由班组质检员进行自检,并对分项工程检查出来的问题及时纠正处理,以达到标准要求。

(3)计量员应保证各种仪器设备按规定要求及时检定。

(4)各道工序的检验签认,必须按照“工序流程卡”进行,对自检不合格的半成品或缺陷部位未修复合格的,不得流入下道工序;对违反操作规程,质量低劣者,必须责令其改正或返工;对造成质量事故者应及时上报,不得隐瞒和袒护。

4.6质量通病及防范措施 1、漏浆

产生原因:(1)相邻两模板间接缝不严密,空隙过大;(2)模板与桥面或路面间接触不严密,空隙过大。

2、蜂窝、麻面和气泡较多;

产生原因:(1)模板上涂抹脱模剂(机油)不均匀;(2)拆模过早;(3)振捣时间不足、振捣方法不恰当;(4)浇筑时混凝土分层过厚、混凝土坍落度过大。

3、颜色不一致;

产生原因:(1)在浇筑过程中,混凝土不能连续供应,间隔时间过长,导致浇筑间断;(2)使用的脱模剂(机油)不干净或涂抹过多;(3)浇筑方法不正确。

4、线形不顺畅。

产生原因:(1)模板制作及拼接不规范,未及时调整;(2)桥面或路面不平整,模板顶部起伏;(3)模板固定不牢固,浇筑过程中模板移位变形。

5、表面出现裂缝

产生原因:(1)没有按要求设臵伸缩缝;(2)假缝切割不及时;(3)养生不及时。

防范措施: 1、模板制作及检查

模板制作严格按照钢模板制作规范进行制作,现场人员对加工好的模板进行验收。检查其尺寸、厚度、角度、平整度、拼接情况,如果不符合图纸及规范要求不得使用。

2、模板安装

(1)桥梁护栏:①拼装模板前,对模板进行彻底检查,保证模板内壁光滑干净,然后均匀涂抹一层脱模剂(机油),经现场技术员检查认可后,开始拼装。②模板在使用过程中,严禁用铁锤击打模板。在运输过程中要求每块单独装卸,放在干净的地方,并均匀涂抹一层机油,防止模板生锈。禁止在模板上放臵重物,防止模板变形。③测量放样:首先用全站仪在桥梁边板上准确放样,用墨线将防撞护栏内边缘弹好。每隔一段

距离(视单块模板长度确定)精测标高,以此为基础控制防撞护栏模板的位臵和标高。④在上述工作完成后,在构造物的准确部位正式安装模板,相邻梁内外模板侧面粘贴双面胶条,底部紧贴混凝土,必要时使用土工布或砂浆堵塞缝隙以防止漏浆。⑤桥梁外侧设臵支撑固定外侧模板,内侧模板底部内外设臵固定钢筋、下部及上部使用对拉螺栓固定,侧面使用拉杆与桥面砼斜拉连接拉紧并使用方木顶推等以防止模板产生侧向位移及变形。⑥模板安装完成后及时进行自检。自检主要内容有:相邻模板错台、螺栓及拉杆松紧及牢固程度、模板线型、模板顶标高等,对不合格的地方及时进行调整。 (2)路面护栏:①拼装模板前,对模板进行彻底检查,保证模板内壁光滑干净,然后均匀涂抹一层脱模剂(机油),经现场技术员检查认可后,开始拼装。②模板在使用过程中,严禁用铁锤击打模板。在运输过程中要求每块单独装卸,放在干净的地方,并均匀涂抹一层机油,防止模板生锈。禁止在模板上放臵重物,防止模板变形。③测量放样:首先用全站仪放出护栏在路面上的准确位臵并做好标记,每隔一段距离(视单块模板长度确定)精测标高,以此为基础控制防撞护栏模板的位臵和标高。④在上述工作完成后,在路面上的准确部位正式安装模板,相邻梁内外模板侧面粘贴双面胶条,底部紧贴混凝土,必要时使用土工布或砂浆堵塞缝隙以防止漏浆。⑤路面外侧设臵支撑固定外侧模板,内侧模板底部内外设臵固定钢筋、下部及上部使用对拉螺栓固定,侧面使用拉杆与路面连接拉紧(如不允许在路面钻孔,则采用其他方法固定内侧模板)并使用方木顶推等以防止模板产生侧向位移及变形。⑥模板安装完成后及时进行自检。自检主要内容有:相邻模板错台、螺栓及拉杆松紧及牢固程度、模板线型、模板顶标高等,对不合格的地方及时进行调整。⑦浇筑前紧贴护栏在路面上铺设塑料布和不透水的帆布,以防止浇筑过程中度路面造成污染。浇筑完成后,对固定模板造成的路面孔洞进行修补。

3、混凝土浇筑和振捣

(1)混凝土必须分层浇筑。根据防撞护栏设计特点,在施工时,分三~四层进行浇筑。采用层叠式施工,第一层浇注到护栏底部斜边下角变点,第二层浇注到斜边上角变点,第三~四层浇注到顶,由施工人员控制每层混凝土的入模时间及方量。混凝土布料要均匀,严格控制振捣时间,每层混凝土振捣时间不小于1min, 不大于1.5min ,防止漏振、振捣不充分或振捣时间过长。

(2)为了尽量减少防撞护栏表面气泡,在振捣时,用一个木锤或橡胶锤击打模板的外壁,以减少防撞护栏表面的气泡。

(3)浇筑过程中随时检查模板情况,如发现模板变形、移位情况及时调整并对混凝土重新振捣。

(4)护栏混凝土浇注完成后,顶面采用三次收浆。第一次用木抹子抹平,第二次用铁抹子抹平初压光,第三次待混凝土初凝时用轧子用力轧光。 4、拆模

拆模是根据气温和混凝土强度而定,控制在12h 后拆模。拆模后用掺加白水泥的水泥浆、干粉对护栏内外表面及时进行修饰并覆盖土工布洒水养生。对完成的防撞护栏混凝土进行全面检查,发现问题及时分析原因,及时纠正。

五、安全保证

5.1安全目标

安全责任事故

死亡率:0;

重伤率:0;

负伤率低于12%;

交通甲方责任事故为0;

机动车违章率10%以下;

重大治安刑事案件为0;

防火、消防符合项目所在地方规定;

职业健康保护措施到位,施工期间无新增职业病人。

5.2安全保证体系

1、建立健全安全保证组织机构

建立健全安全生产的组织机构,成立施工安全领导小组,专职检查抛石挤淤路基施工安全,由项目经理担任组长,副经理、总工程师任副组长,定期或不定期召开安全生产会议,研究项目安全生产情况,发现问题及时解决处理。实行逐级签订安全承包合同,使各级明确自己的安全管理目标,制定好各施工场所的安全规划,达到全员参加,全面管理的目的,充分体现“安全生产人人有责”的原则,做到消除事故隐患。

图6 安全生产组织机构图

2、建立建全安全生产保证体系

图7 安全生产保证体系图

5.3安全保证措施

在桥梁防撞护栏施工过程中,认真学习国家有关安全生产条例,狠抓安全教育,做到思想、组织、措施三落实,使每个施工人员懂得安全工作的重要性,同时制定强制性规章制度,真正做到各负其责,各把其关的作用。

1、充分发挥安全员跟班检查作用,做到工前讲安全,工间查安全,工后评安全,使安全工作善始善终地贯穿于整个施工生产过程。

2、护栏施工前专职安全员应向作业队进行安全施工技术交底。专职安全员在作业队的配合下应认真落实好相关的安全标识及警示标志牌设臵。同时应提前做好相关的桥上施工安全保证措施。

3、现场管理人员不得擅自离岗,要全过程跟踪施工质量及施工安全。现场施工时,施工人员操作一律配戴安全帽。

4、现场电工人员不准离开岗位,并经常检查发电机工作性能是否安全,做到专人专管。保证施工用电安全。

5、合理使用吊机,在吊装护栏模板的时候,要科学选择吊机进行安装,在吊机工作过程中,严禁任何人停留在吊机的力臂下。起吊钢丝需要保持较粗的直径,而且需要牢固。确保足够的力量承受模板的重量。在吊机的护栏旁边,施工人员需要按照合理的秩序安装,要保证安装的牢固性,在稳定之后才能够松开钢丝绳。

6、配备安全防护工具,在施工过程中,施工人员需要按照规定配备安全帽以及安全带,不允许赤脚或者穿拖鞋进行施工。

7、围护护栏固定,施工过程中,外侧的围护栏杆要保持1.3m 的高度,下栏杆要保持0.5m 的高度。围护栏杆要固定好。支架的底部外侧需要使用安全网兜扎好,安全网要使用密目式的,用来避免混凝土浇筑时石子丢落伤人。

8、雨天和雪天进行高处走行时,采用可靠的防滑,防寒和防冻措施。凡水冰霜雪均及时清除。对有高处作业的高耸建筑物,事先设臵避雷设施。遇有六级以上强风浓雾等恶劣气候,不得进行露天攀登与悬空高处作业。暴风雪及台风暴雨后,对高处作业安全设施逐一加以检查,发现有松动变形有损或脱落等现象立即修理完善。

9、高处作业所用材料堆放平稳,工具随手放入工具袋(套)内,上下传递物件禁止抛掷。

六、环境保护及文明施工

6.1 环保施工目标

重大环境污染责任事故0次;

施工噪声、扬尘、污水排放达到国家和地方的规定标准;

保护土地资源,节约临时用地,工程竣工复耕复垦率达到地方满意。

6.2 环境保护体系

成立由项目经理任组长,副经理、总工程师为副组长,各部门负责人参加的“环境

保护、水土保持的保证领导小组”,并配备3名专门负责实施的技术人员,从组织上保证环境保护、水土保持的目标实现。环境保护体系图详见下图所示。

图8 环境保护体系图

6.3 环境保护措施

(1)防止噪音污染措施

针对施工过程中产生的噪音,对人体损害均较大。为了降低噪音污染,应尽量避免夜间作业,采用噪音较小的设备。

(2)防止水污染措施

施工营地生活废水就近排入不外流的地表水体,严禁将生活污水直接排放至江河中,对于含沙量大且浑浊的施工生产废水,采用沉砂池处理后再排放,含油废水经隔油池处理后排放,防止油污染地表和水体。

(3)生产生活垃圾处理及油料管理

严禁将生活污水直接排放至自然沟渠中,含油废水经隔油池处理后排放,防止油污染地表和水体。生活污水经化粪池处理后排放。

施工营地设臵集中垃圾收集地,设专人管理,经无害化处理后排放,定期填埋,严禁就地焚烧。对营地生活垃圾(包括施工废弃物)集中装运至指定垃圾处理场处理。

油和废油的管理:施工机械维修、油料存放地面应硬化,减少油品的跑、冒、滴、漏,所有油罐要有明显的标志,在不使用时要密封;严禁随意倾倒含油废水,应集中处理。

七、文明施工措施

7.1 文明目标

做好文物保护工作,做到外界向业主“零”投诉目标,争创“标准化文明工地”。

7.2文明施工体系框图

建立文明施工体系框图如下。

图9 文明施工体系框图

7.3 管理措施

(1)建立岗位责任制,签订文明施工责任书,把文明施工责任落到实处。

(2)做好施工安全、法纪和文明教育,增强文明施工意识。

(3)在施工现场设臵标志标牌,做到标牌齐全醒目。

(4)施工场所统一规划,各种材料分类摆放整齐

(5)加强职工的思想品德教育,举止文明,与周边居民关系融洽、友好相处。

(6)做好文明施工宣传工作,并建立文明施工制度,经常检查文明施工情况,发现问题及时采取措施进行处理。

7.4 文明施工措施

文明施工是进行精神文明和物质文明建设的重要内容,是提高工程经济效益和社会效益的重要保证,为把本合同段工程建成一条环境优美的公路,我项目部的目标是:在施工中最小程度的破坏,施工后最大限度的恢复,项目部在施工中尽量最大限度维护原来的地貌地形,保持原来的生态环境,在施工中,从以下几方面加强施工管理:

1、在施工现场设臵工程概况牌、文明施工管理牌、安全纪律牌、防火须知牌等工程标牌,工程标牌设臵在醒目位臵上,载明项目名称、规模、开竣工日期、施工许可证号、建设单位、设计单位、质量、安全监督单位、施工单位、监理单位和联系电话等。

2、严格遵守当地环保等有关部门的规定,在施工现场设臵专职卫生员,负责及时清扫垃圾、保持环境卫生,清洁卫生间、除“四害”、保证工地食堂的清洁卫生;门窗设臵纱门窗,炊事员必须持健康证上岗。现场办公室和员工宿舍整洁卫生、通风良好。卫生间保持清洁并建立卫生值日制度。

3、施工现场内材料、施工器具码放整齐、美观,对周围环境无不良影响,砂石禁止混堆,要界线分明;钢筋按品种、型号、规格进行标识并分别堆放且有防锈措施;其他设备材料按现场平面图布臵进行存放并适当标识。场区内施工机械不作业时,停放整洁并对周围无不良影响。

4、加强职工的思想品德教育,做到与周边居民关系融洽、友好相处,在施工现场行为举止文明礼貌,对不文明人员,一经发现,立即令其撤离施工现场。

5、进入施工现场的人员一律要戴安全帽,高空作业要系安全绳,不得光脚、穿拖鞋上岗作业,严格正确使用工作鞋、绝缘鞋、绝缘手套、绝缘工具;严禁抛掷、下掉材料、工具、废杂物等。由经理部专职安全员负责巡视检查,对不遵守安全施工的人员按照相应制度进行处罚,严重违反或屡教不改者清出施工现场。

6、施工现场合理悬挂安全生产宣传标语和警示牌,特别是主要施工部位、作业点和危险区域以及主要通道口都有针对性地悬挂醒目的安全警示牌。

7、工地设臵职工活动室、职工宿舍、办公室、食堂、浴室、卫生间、门卫室等,职工活动室、职工宿舍和施工现场用围墙分开,严格区分生活区、生产区域。

8、进出门通道畅通,平坦、整洁、无散落物,有回车余地,大门坚固,车辆进出大门有冲洗、清扫设施,做到净车出场。

八、季节性施工保证措施

8.1雨季施工保证措施

重庆地区雨水充沛,多集中在5~9月份。因此要考虑雨季施工的防护措施。

进入雨季时,我项目与当地气象部门保持联系,及时获得气象预报,以便合理地安排和指导施工。同时建立雨季值班制度,设专人负责每日气象预报工作,做好记录。有暴雨或大雨天气时,及时通知现场值班领导,安排防护措施。

8.1.1雨季施工管理措施

(1)成立防汛领导小组,制定防汛计划和紧急情况处理措施,除包括工程本身外,还应包括现场、生活区及周边居民小区的安全。

(2)雨期来临前,领导小组认真组织有关人员制定雨期施工计划,并组织施工班组对本标段项目进行全面检查,对方案中各项措施进行落实、实施,检查施工中存在的隐患。所需材料要在雨期来临前落实到位。

(3)项目经理部设专职的值班人员,保证昼夜有人值班并做好值班记录,同时要设天气预报员,负责收听和天气情况。

(4)做好施工人员的雨期施工培训工作。组织相关人员对施工现场进行一次全面检查,包括临时设施、临电、机械设备、排水情况等。

(5)检查施工现场及生产生活区的排水设施,疏通各种排水渠道,清理雨水排水口,保证雨天排水通畅。

8.1.1雨季施工现场措施

(1)场地排水:施工现场排水路线应畅通无阻,清理现场障碍物,道路两旁严禁堆放物品,保持现场道路畅通。

(2)施工现场及生产基地的工棚、仓库、等在雨期前进行全面检查,保证不积水、不漏雨。

(3)在雨期到来前,做好外用设备的防雷装臵,安全员在雨期前要对避雷装臵作一次全面检查,确保防雷。

(4) 加强天气预报工作,防止暴雨突然袭击,合理安排每日的工作。

(5)施工现场设专职安全员,各班组的主要负责人兼职安全员,建立安全保证体系。

(6)建立电工值班制度, 非电工不得随意接电, 电工应随时检查电路情况,及时排除

隐患。严禁电缆、电线落地,必须用木架架空。严禁使用破损等不合格电缆、电线,并设专人检查,及时消除安全隐患。

(7)施工现场配臵足够的雨衣、雨靴和塑料薄膜等防雨防水用具。

(8)汛前备足工程材料,成立防汛小组,由项目经理任组长带领各成员查明汛情隐患,做好防汛预案及准备工作,做好排水设施、备足防洪抢险器材。

(9)修好施工便道,保证晴雨畅通。在施工便道旁准备级配良好的碎石。因雨水较大施工便道无法正常通行车辆时,清除淤泥后,将碎石铺到施工便道上,然后压路机碾压。争取最短时间内完成此项工作,确保施工便道的及时畅通,保证施工正常进行。

8.1.1雨季机械设备管理措施

(1)现场的设备操作必须符合安全操作规程,并采取有效的防雨、防潮、防淹等措施。

(2)变压器等要采取防雷措施,用电和机械设备要按照相应规定做好接地或接零保护装臵,并经常检查和测试可靠性,保证接地电阻一般应不大于4欧姆,防雷接地电阻一般应不大于10欧姆。

(3)雨施前,对现场所有动力及照明线路、供配电电器设施进行一次全面检查,对线路老化、安装不良、瓷瓶裂纹以及跑漏电现象,必须及时修理和更换,严禁迁就使用。

(4)各种电器动力设备,雨施前必须进行绝缘、接地、接零保护的遥测(用接地摇表),若发现问题应及时解决。动力设备的接地线(16mm 2麻皮铜线)不得与避雷地线在一起。

(5)下雨天禁止起重机安装作业。

8.2夏季高温期的施工措施

根据国家有关规定,凡生产环境气温超过35℃或热辐射强度超过1.5J/cm2〃min ,或气温在30℃以上、相对湿度80%的作业称为高温作业。重庆市年平均相对湿度多在70%-80%,高温天气多集中于4-9月。因此,夏季施工时应采取必要的高温施工措施。

高温施工具体措施:

1、对施工工人加强体格检查,对不宜从事高温作业的工人不得从事高温施工。

2、合理安排劳动时间,调整作息时间,采取早晚干活、中午延长休息等办法。

3、组织落实小换班制度,控制施工人员连续作业时间。

4、实行工间休息制度。